{"id":9284,"date":"2018-05-20T14:44:52","date_gmt":"2018-05-20T11:44:52","guid":{"rendered":"https:\/\/modecon.mnau.edu.ua\/?p=9284"},"modified":"2018-05-21T09:32:30","modified_gmt":"2018-05-21T06:32:30","slug":"institute-of-public-private-partnership-in-the-context-of-the-possible-directions-of-the-social-capital-formation","status":"publish","type":"post","link":"https:\/\/modecon.mnau.edu.ua\/en\/institute-of-public-private-partnership-in-the-context-of-the-possible-directions-of-the-social-capital-formation\/","title":{"rendered":"Dubinina M., INSTITUTE OF PUBLIC-PRIVATE PARTNERSHIP IN THE CONTEXT OF THE POSSIBLE DIRECTIONS OF THE SOCIAL CAPITAL FORMATION"},"content":{"rendered":"

[vc_row][vc_column][vc_column_text]JEL Classification: <\/strong>D71<\/p>\n

Dubinina M., <\/strong>Doctor of Economics, Associate Professor, Mykolayiv National Agrarian University<\/p>\n

INSTITUTE OF PUBLIC-PRIVATE PARTNERSHIP IN THE CONTEXT OF THE POSSIBLE DIRECTIONS OF THE SOCIAL CAPITAL FORMATION<\/strong><\/p>\n

Introduction. <\/strong>The article is devoted to the study of the institute of public-private partnership (PPP) and possible directions of the social capital formation. The paper analyzes the modern practice of realization of public-private partnership projects. Such projects include the presence of trust between central or local authorities and the private sector.<\/em><\/p>\n

The objective<\/strong> of the article is to substantiate the directions of the social capital formation in the process of implementation of the institution of public-private partnership.<\/em><\/p>\n

Results.<\/strong> The analysis of the institute of public-private partnership as an opportunity to mobilize previously unused private sector resources at the local and regional levels was carried out. Studies have shown that with the transition to an innovative way of development, public-private partnership becomes an effective institutional form of attracting private capital for solving problems in the field of scientific research, construction of infrastructure facilities, energy, and social sphere. In our opinion, it is not a new institution, in one form or another, it accompanies all historical periods of state development, but at the present stage it becomes of special significance. The conducted researches suggest that the successful implementation of projects through PPP largely depends on such a universal cultural characteristic as the confidence level of a given society. It was revealed that the lack of trust is one of the most significant causes of social tension, the erosion of social networks and the reduction of social capital.<\/em><\/p>\n

Proposals have been developed that suggest that the state is the most active in partnership for the implementation of the social function, since it is less interested in preserving the exclusivity of sovereign powers in this area.<\/em><\/p>\n

Thus, social capital not only provides a stable flow of public capital, but also sets the social vector of its development through the institution of public-private partnership.<\/em><\/p>\n

Keywords:<\/strong> institute, public-private partnership; social capital, state, contract.<\/em><\/p>\n

References:<\/strong><\/p>\n

    \n
  1. Butenko, N. V. (2015), Development of partnership in the national economy, National Academy of Sciences of Ukraine, Institute of Industrial Economics, Kyiv, Ukraine [in Ukrainian].<\/li>\n
  2. Tarash, L. I. and Petrova, I. P. (2015), \u201cGeneralization of the practice of using the forms of public-private partnership\u201d, Bulletin of the Economic Science of Ukraine<\/em>, vol. 2 (29), pp. 97-103 [in Ukrainian].<\/li>\n
  3. Shylepnytskyi, P. I. (2011), Public-private partnership: theory and practice, Institute of Regional Studies of the National Academy of Sciences of Ukraine, Chernivtsi, Ukraine [in Ukrainian].<\/li>\n
  4. Teng, T. L. Yuan, J. F. and Li, Q. M. (2014), \u201cAnalysis of the Formation Path of the Residual Value Risk in Public Private Partnership Projects Based on SEM Method\u201d, Advanced Materials Research<\/em>, vol. 1079- 1080, pp. 1126-1130.<\/li>\n
  5. Teng, T. Li, Q. Yuan, J. and Deng, X. (2015), \u201cAn Attempt to Apply Vulnerability for Quantifying Risks in Public Private Partnership Projects\u201d, Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate<\/em>, 28 Apr 2015, pp. 799-808.<\/li>\n<\/ol>\n
    \"dubinina.pdf\"<\/div>
    dubinina.pdf<\/div><\/div>
    <\/div>
    <\/div>
    Size: <\/span>0.39 Mb<\/span><\/div>
    Download Now!<\/a><\/span>327<\/span> Downloads<\/span><\/span><\/div><\/div>
    <\/div>\n

    << Back to contents<\/a><\/p>\n

    [\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/section>","protected":false},"excerpt":{"rendered":"

    [vc_row][vc_column][vc_column_text]JEL Classification: D71 Dubinina M., Doctor of Economics, Associate Professor, Mykolayiv National Agrarian University INSTITUTE OF PUBLIC-PRIVATE PARTNERSHIP IN THE CONTEXT OF THE POSSIBLE DIRECTIONS OF THE SOCIAL CAPITAL FORMATION Introduction. The article is devoted to the study of the institute of public-private partnership (PPP) and possible directions of the social capital formation. The paper
    Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[92,67],"tags":[93],"class_list":["post-9284","post","type-post","status-publish","format-standard","hentry","category-8-2018","category-articles","tag-8-2018"],"_links":{"self":[{"href":"https:\/\/modecon.mnau.edu.ua\/en\/wp-json\/wp\/v2\/posts\/9284"}],"collection":[{"href":"https:\/\/modecon.mnau.edu.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/modecon.mnau.edu.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/modecon.mnau.edu.ua\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/modecon.mnau.edu.ua\/en\/wp-json\/wp\/v2\/comments?post=9284"}],"version-history":[{"count":0,"href":"https:\/\/modecon.mnau.edu.ua\/en\/wp-json\/wp\/v2\/posts\/9284\/revisions"}],"wp:attachment":[{"href":"https:\/\/modecon.mnau.edu.ua\/en\/wp-json\/wp\/v2\/media?parent=9284"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/modecon.mnau.edu.ua\/en\/wp-json\/wp\/v2\/categories?post=9284"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/modecon.mnau.edu.ua\/en\/wp-json\/wp\/v2\/tags?post=9284"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}